Donate using PayPal

All photos in & around Bala

Showing items 1 to 100 from total of 380 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
163799Photo #163799Dual use cycleway required along the A5Cycleway:
Problem
cycleways
163798Photo #163798Dual use cycleway required along the A5Cycleway:
Problem
cycleways
162502Photo #162502Bridge for cyclists & pedestrians beside railway is goodTemporary closure:
Problem
closure
162501Photo #162501Bridge for cyclists & pedestrians beside railwayTemporary closure:
Problem
closure
151421Photo #151421Route heavily used by cyclists and pedestrians, introduce 20mph speed limit for carsTemporary closure:
Problem
closure
145799Photo #145799Footpath from the bridge meets the road, pedestrians and cyclists have to dash across an oncoming lane of traffic to get onto bridge from the opposite side. Needs a footpath on this side or a safe crossingTrack:
Problem
track
145798Photo #145798Footpath from the bridge meets the road, pedestrians and cyclists have to dash across an oncoming lane of traffic to get onto bridge from the opposite side. Needs a footpath on this side or a safe crossing.Track:
Problem
track
141054Photo #141054A cycle path was constructed a few years ago from Tywyn towards Aberdyfi but instead of going all the way it ends just past the Cwm Maethlon/Happy Valley lane leaving any cyclists wishing to continue to Aberdyfi with a very hazardous ride. I believe the cycle route was supposed to link Tywyn and Aberdyfi but the money promised to complete went elsewhere.Cycleway:
Problem
cycleways
140917Photo #140917A shared use path has been recently built to connect the Ffordd Cynan housing estate with the shops on Caernarfon Road. However, there are 3 barriers which make it impossible for users with non-standard bicycles (e.g. hand cycles, cargo bikes) to use.Cycleway:
Problem
cycleways
135757Photo #135757Pedestrianisation with cycling allowed to counter fact that currrent 1-way system does not always allow access from main roads/cycle routeTemporary closure:
Problem
closure
133361Photo #1333611. Cycleway needs to be marked between Groeslon and Dolydd Garage to allow residents of Groeslon to access their local shop safely without having to use a car.Cycleway:
Problem
cycleways
133360Photo #133360Pavement needed between houses at Maencoch and Dolydd Garrage.Track:
Problem
track
133359Photo #1333591. Pedestrian crossing opposite Millets shop needs to be converted to a pedestrian/cycle crossing. Pavements on both sides of the road need to be redesignated as cycleways to allow safe cycle link between Rhosisaf/Rhostryfan and the Lon Eifion Cycleway at Glanrhyd.Cycleway:
Problem
cycleways
133356Photo #1333561. No cycle lanes leading to school. School located on an A road.
2. No safe and secure facilities to lock bikes during school day.
Cycleway:
Problem
cycleways
131584Photo #131584Just the whole of Bangor ... what a car-dominated hell hole. I can't believe a student town has such desperately non-existant provision for....PEOPLE to have enjoyable, safe lives in this city. I am so glad I was not locked down here!Cycleway:
Problem
cycleways
128096Photo #128096Pavement needed hereTrack:
Problem
track
128048Photo #128048Cycleway needed along this narrow stretch of the roadCycleway:
Problem
cycleways
128047Photo #128047Complete the cycleway from Beran to Ynys Iago.Cycleway:
Problem
cycleways
125983Photo #125983Cyle route is on a very narrow pavement which is shared by walkers. Dedicated cycle path needed here.Cycleway:
Problem
cycleways
125975Photo #125975Very narrow pavement on both sides of a very busy road makes it impossible and dangerous for people walking to distance themselves from others. Could widen the pavement or close one lane (making it a one way system) for walkers and cyclist to share.Track:
Problem
track
124645Photo #124645Bollards do nothing for safety as they distract cyclists who need to keep an eye open for traffic. So little traffic uses this entrance that priority could be changed to prioritise cyclists and pedestrians. Changing priority and removing bollards would be a great improvement.Cycleway:
Problem
cycleways
124629Photo #124629Narrow path. Acquire land from adjoining field and move fence to allow widening of path.Cycleway:
Problem
cycleways
115463Photo #115463New cycleway by the A5, Bangor - a crossing to the Llandygai road would be helpful.Cycleway:
Infrastructure
cycleways
115462Photo #115462New cycleway by the A5, BangorCycleway:
Infrastructure
cycleways
115461Photo #115461New cycleway by the A5, BangorCycleway:
Infrastructure
cycleways
115460Photo #115460Crossing needed from service road to the new cyclewayRoad environment:
Infrastructure
road
115310Photo #115310Junction of NCN routes 5 and 8, BangorRoute sign:
Infrastructure
routesigns
115309Photo #115309Junction of NCN routes 5 and 8, BangorCycleway:
Infrastructure
cycleways
115308Photo #115308NCN routes 5 and 8 towards the Menai BridgeCycleway:
Infrastructure
cycleways
115307Photo #115307NCN route 8 running south from the junction with NCN route 5, BangorCycleway:
Infrastructure
cycleways
115306Photo #115306Junction of NCN routes 5 and 8, BangorRoute sign:
Infrastructure
routesigns
115303Photo #115303Railway quadricycle at the Industrial Railway Museum, Penrhyn CastleBicycle:
Misc
bicycles
115302Photo #115302Signs on NCN route 5 - turn right through the gate to LlandygaiRoute sign:
Infrastructure
routesigns
115301Photo #115301Westbound cyclists on NCN route 5 can loop through Talybont to briefly get off the former main road.Road environment:
Infrastructure
road
115300Photo #115300Route sign on NCN route 5 - in the other (westbound) direction it's possible to loop through TalybontRoute sign:
Infrastructure
routesigns
115299Photo #115299Cyclists on NCN route 5 are supposed to rejoin the old main road here.Road environment:
Infrastructure
road
115298Photo #115298Gate at start of traffic-free link on NCN route 5, LlandygaiCycleway:
Infrastructure
cycleways
115297Photo #115297Damp section on traffic-free link on NCN route 5, LlandygaiCycleway:
Infrastructure
cycleways
115296Photo #115296Gate at end of traffic-free link on NCN route 5, LlandygaiCycleway:
Infrastructure
cycleways
115295Photo #115295Traffic-free link on NCN route 5, LlandygaiCycleway:
Infrastructure
cycleways
115294Photo #115294Start of traffic-free link on NCN route 5, LlandygaiCycleway:
Infrastructure
cycleways
115293Photo #115293NCN route 5 passing the gates to Penrhyn Castle (National Trust)Cycleway:
Infrastructure
cycleways
115292Photo #115292Very basic crossing of the A5 on NCN route 5, BangorCycleway:
Infrastructure
cycleways
115291Photo #115291NCN route 5 - shared-use footway by the A5, BangorCycleway:
Infrastructure
cycleways
115290Photo #115290Shared-use footway by the A5, BangorCycleway:
Infrastructure
cycleways
115289Photo #115289Shared-use link to industrial estate, BangorCycleway:
Infrastructure
cycleways
115288Photo #115288Shared-use footway by the A5, BangorCycleway:
Infrastructure
cycleways
115287Photo #115287Shared-use footway by the A5, BangorCycleway:
Infrastructure
cycleways
115286Photo #115286Link to NCN route 5 (right) and footway by the A5, BangorCycleway:
Infrastructure
cycleways
115285Photo #115285Link from railtrail section of NCN route 5 (Lon Las Ogwen)Cycleway:
Infrastructure
cycleways
115284Photo #115284Railtrail section of NCN route 5 (Lon Las Ogwen)Cycleway:
Infrastructure
cycleways
115283Photo #115283The railtrail section of NCN route 5 (Lon Las Ogwen) passing beneath the A5Cycleway:
Infrastructure
cycleways
115282Photo #115282Narow bridge on the railtrail section of NCN route 5 (Lon Las Ogwen)Cycleway:
Infrastructure
cycleways
115281Photo #115281Narrow bridge on the railtrail section of NCN route 5 (Lon Las Ogwen)Cycleway:
Infrastructure
cycleways
115280Photo #115280Narrow bridge on the railtrail section of NCN route 5 (Lon Las Ogwen)Cycleway:
Infrastructure
cycleways
115279Photo #115279End of railtrail section of NCN route 5 (Lon Las Ogwen)Cycleway:
Infrastructure
cycleways
115278Photo #115278Start of railtrail section of NCN route 5 (Lon Las Ogwen)Cycleway:
Infrastructure
cycleways
115277Photo #115277Perfectly positioned to mask the route signs.Route sign:
Event
routesigns
115276Photo #115276NCN route 5 forks left then turns right under the other road.Route sign:
Infrastructure
routesigns
115275Photo #115275Segregated two-way footway on NCN route 5, BangorCycleway:
Infrastructure
cycleways
115274Photo #115274Segregated two-way footway on NCN route 5, BangorCycleway:
Infrastructure
cycleways
115273Photo #115273NCN route 5, BangorCycleway:
Infrastructure
cycleways
115272Photo #115272NCN route 5, BangorCycleway:
Infrastructure
cycleways
115271Photo #115271Dropped kerb required - this is meant to be NCN route 5!Obstruction:
Problem
obstructions
115270Photo #115270Awkward barrier on NCN route 5, BangorObstruction:
Problem
obstructions
115269Photo #115269Route sign on NCN route 5, Bangor - not an immediate left turn, but following the road.Route sign:
Infrastructure
routesigns
115268Photo #115268NCN route 5 heading up from the waterfront, BangorCycleway:
Infrastructure
cycleways
115267Photo #115267Messy patch on NCN route 5, BangorCycleway:
Infrastructure
cycleways
115266Photo #115266NCN route 5 cutting down to the waterfront, BangorCycleway:
Infrastructure
cycleways
115265Photo #115265No Cycling on Garth Pier, BangorGeneral sign/notice:
Infrastructure
signs
115264Photo #115264Route signs on NCN route 5, BangorRoute sign:
Infrastructure
routesigns
115263Photo #115263Route sign on NCN route 5, BangorRoute sign:
Infrastructure
routesigns
115262Photo #115262Route sign to NCN route 5, BangorRoute sign:
Infrastructure
routesigns
115261Photo #115261Crossing on link from NCN route 5 to central BangorCycleway:
Infrastructure
cycleways
115260Photo #115260Crossing on link to NCN route 5Cycleway:
Infrastructure
cycleways
115259Photo #115259Gate and hidden sign on this cycle link on NCN route 5Obstruction:
Problem
obstructions
115258Photo #115258Cyclists Dismount sign, BangorGeneral sign/notice:
Infrastructure
signs
115257Photo #115257Cyclists Dismount sign, BangorGeneral sign/notice:
Infrastructure
signs
115256Photo #115256Cycle parking, BangorCycle parking:
Infrastructure
cycleparking
115255Photo #115255This obstruction isn't going anywhere soon.Obstruction:
Event
obstructions
115254Photo #115254Cut-trhough in BangorCycleway:
Infrastructure
cycleways
114870Photo #114870Route sign on local route 15 in BalaRoute sign:
Infrastructure
routesigns
114869Photo #114869Right turn off the A494 on local route 15 in BalaRoute sign:
Infrastructure
routesigns
114868Photo #114868Bike rental by Lake BalaBike shop:
Infrastructure
bikeshops
114867Photo #114867New route parallel to the A494 to BalaCycleway:
Infrastructure
cycleways
114866Photo #114866New route parallel to the A494 to BalaCycleway:
Infrastructure
cycleways
114865Photo #114865Bridge on new route parallel to the A494 to BalaCycleway:
Infrastructure
cycleways
114864Photo #114864Information panel on new route parallel to the A494 to BalaGeneral sign/notice:
Infrastructure
signs
114863Photo #114863New route parallel to the A494 south from BalaCycleway:
Infrastructure
cycleways
114862Photo #114862Flooding on new route parallel to the A494 to BalaObstruction:
Event
obstructions
114861Photo #114861New bridge on route parallel to the A494 to BalaCycleway:
Good practice
cycleways
114860Photo #114860Start of route parallel to the A494 to BalaCycleway:
Infrastructure
cycleways
114859Photo #114859Very worn route signs on local route 13, south of BalaRoute sign:
Problem
routesigns
114858Photo #114858Heritage bike at heritage railway, BalaBicycle:
Infrastructure
bicycles
114857Photo #114857Very worn route signs on local route 13, south of BalaRoute sign:
Problem
routesigns
114856Photo #114856Very worn route signs on local route 13, south of BalaRoute sign:
Problem
routesigns
114855Photo #114855Riverside path, BalaTrack:
Infrastructure
track
114854Photo #114854I wouldn't bother with the route under the bridgeOther:
Problem
general
114853Photo #114853Slightly improved access to the riverside route, Bala (see #57447)Obstruction:
Infrastructure
obstructions
113933Photo #113933Stainless steel racks in Blanaeu FfestiniogCycle parking:
Good practice
cycleparking

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://bala.cyclestreets.net/photos/all/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.