Category: | Cycleway: Other (infrastructure-related) |
Tags: | bangor, ncn5, wales |
Date time: | 4.08pm, Wednesday 4th March, 2020 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bala |
Messy patch on NCN route 5, Bangor
Comments reflect the views of the original submitter only.