Category: | Cycleway: Other (infrastructure-related) |
Tags: | bala, wales |
Date time: | 1.22pm, Saturday 29th February, 2020 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bala |
Start of route parallel to the A494 to Bala
Comments reflect the views of the original submitter only.